Wednesday, October 7, 2009

Friday 4pm

Postponed walkthrough... next attempt is 4 PM Friday.

The generator was worked on all day Wednesday. We will get the details on what was done Friday. The generator had two known problems: (1) Output frequency varied wildly between 50 and 60 Hz. (2) During shutdown it would occasionally throw an overspeed error.

Further modifications are:
  • Installation of timer for the pan heater to keep the genset warm during critically cold periods of time.
  • Connection of autostart connection from the inverter to the genset

1 comment:

JRudewick said...

So sorry. I know that you were anxious to get it all settled. But you surely want the electrical system working correctly before you sign off on anything. Sounds like they are being thorough. That is good.