Tuesday, July 7, 2009

Roughing it up a bit

Another smokey day in Fairbanks. Ester Dome is usually quite visible.


Siding has arrived:


Super insulated walls (Fairbanks designed remote wall):


Insulation going up, occasional holes so they can still see what is going on inside:


Ceiling vapor barrier. The insulation is normally put in after drywall is in place. With vaulted ceilings, the insulation needs to be put in first between the ceiling and the roof.


Master bath tub is already in place with plumbing roughed in and insulation on the wall:


Garage. Septic and HRV rough ins started:


Septic and radiant heat rough ins:

No comments: