Wednesday, July 15, 2009

2nd Floor, Siding, Insulation

Additional trim around the house:


2nd floor is complete, ready for flooring once windows and drywall are in place. Sidewall insulation going in:


Siding along one wall nearly complete. The square that is incomplete is the probable location of some electrical gear including the generator for long periods without solar or wind.


Looking along the wall, insulation being installed in the 1st floor:


Locked down counter top colors today. Hope to lock down flooring selections in the next couple of days. Continue working on light fixture selections.