First floor nearly enclosed. Steel beams are necessary due to some loads anticipated on the 2nd floor. This will eliminate the need for posts in the center of the Tai Chi room.


There is a beam down the center of the garage. Not sure if there is a center support required.


A partial look at the thickness of the wall being installed around the house:


Anticipate the 2nd floor to be framed and/or enclosed today (Saturday). Doors, windows, and cabinets entering the ordering queue.