The kitchen cabinets are all in place, but the livingroom is still full of the bathroom cabinets, plus the bedroom flooring (cork). There are two big dehumidifiers running, one upstairs, one downstairs.
There's more cork in the garage, for the tai chi room, but none of the rest of the flooring just yet.
They've been trimming the rough edges of the sheet rock around the door frames and installing closet shelves.
1 comment:
Your dye garden is beautiful!
Post a Comment